ON GOING PROJECTS
Infrastructure
1.MEMBINA JALAN DARI SIBU JAYA KE JALAN KONG YIT KHIM SIBU, SARAWAK (REMEDIAL WORKS FOR CH 5+395 TO CH 5+875
Client: Jabatan Kerja Raya
IN PROGRESS
Building
1.PENYIAPAN BAKI KERJA BAGI CADANGAN PEMBINAAN BANGUNAN BARU BLOK PENTADBIRAN, AKADEMIK DAN
PUSAT SEHENTI KOLEJ MATRIKULASI SARAWAK, KUCHING
Client: Kementerian Pendidikan Malaysia
IN PROGRESS
2.PEMBINAAN BAHARU PEJABAT PENDIDIKAN DAERAH SARIKEI, SARAWAK
Client: Kementerian Pendidikan Malaysia
IN PROGRESS
Mechanical Engineering, Electrical & Water Works
1.ENTINGGAN B 275/(33) kV SUBSTATION PROJECT (RETENDER)
Client: Sarawak Energy Berhad
IN PROGRESS
2. SERIAN 275/(132)/33kV Substation Project
Client: Sarawak Energy Berhad
IN PROGRESS
IN PROGRESS
Oil & Gas
Contract Sum: OPEN WORK ORDER / SERVICE ORDER
Commencement Date: 23 July 2026
Completion Date: 23 July 2028
Contract Period: 36 Calendar months
Client: PETRONAS
IN PROGRESS
COMPLETED PROJECTS
Infrastructure
1. DEVELOPMENT AND UPGRADING OF THE PAN BORNEO HIGHWAY IN THE STATE OF SARAWAK (LBU/559/16-11/LA-24)
Nominated Sub Contract For Supply, Delivery and Installation of Traffic Barriers (Guadrails)-Mile 5 – Nyabau Flyover+ Jalan Bakun -Sg. Tangap) Client: Lebuhraya Borneo Utara Sdn Bhd
COMPLETED
2. DESIGN AND BUILD AND NEGOTIATED CONTRACT PROPOSED UPGRADING OF JALAN TUDAN, MIRI DIVISION
Road Pavement Work
COMPLETED
3. PROPOSED DEVELOPMENT AND UPGRADING OF THE PAN BORNEO HIGHWAY IN THE STATE OF SARAWAK
Jalan Nyabau to Jalan Bakun KM719 – KM763
COMPLETED
4. PROPOSED DEVELOPMENT AND UPGRADING OF THE PAN BORNEO HIGHWAY IN THE STATE OF SARAWAK
(Jalan Nyabau to Jalan Bakun KM719 – KM763) Project Management Service – Drainage Works of Work Package 10
COMPLETED
5. PROPOSED COASTAL BUND AND DRAINAGE SYSTEM AT SEBANGAN BAJONG DRAINAGE SCHEME, BLOCK E, SAMARAHAN DIVISION
Client : Jabatan Pengairan dan Saliran Sarawak
COMPLETED
6. PROPOSED JALAN KAMPUNG PENASU KE NANGA SEMAH, DARO, MUKAH, SARAWAK
Client : Jabatan Pengairan dan Saliran Sarawak
COMPLETED
7. DEVELOPMENT AND UPGRADING OF THE PAN BORNEO HIGHWAY IN THE STATE OF SARAWAK – MILE 5 – NYABAU FLYOVER + JLN BAKUN – SG. TANGAP
Bridges work over Sg. Suai, Sg. Sebubok, Sg. Sekaloh & Sg. Tangap of Work Package 10
Client : Pekerjaan Piasau Konkerit Sdn Bhd
COMPLETED
8. DEVELOPMENT AND UPGRADING OF THE PAN BORNEO HIGHWAY IN THE STATE OF SARAWAK – MILE 5 – NYABAU FLYOVER + JLN BAKUN – SG. TANGAP
Drainage Works (Bakun Section : Km 0+000 – Km 41+700)
Client : Pekerjaan Piasau Konkerit Sdn Bhd
COMPLETED
9. PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ A (FASA 3) – PEMBINAAN JALAN DARI KM 9.80 – KM 15.70, PEMBINAAN JAMBATAN SG. SELUAT DAN KERJA-KERJA BERKAITAN
Client : Pekerjaan Piasau Konkerit Sdn Bhd
COMPLETED
10. SUBCONTRACT FOR BRIDGE WORKS, PROPOSED CONSTRUCTION AND COMPLETION OF MUARA LASSA BRIDGE, MUKAH DIVISION (JKR/576/19-01/GF/LA-01)
Client : Pekerjaan Piasau Konkerit Sdn Bhd
COMPLETED
Building
1. THE PROPOSED 91 UNITS DOUBLE STOREY TERRANCE HOUSE ON LOTS 8529-8552 & 10167-10233 [P/L 7530 (ORIGINAL LOT 876)], BLOCK 5, OFF JALAN PROMIN JAYA1, K.B.L.D., MIRI. (PHASE 6&7) PARTICULAR FOR SUBLOT 10167-10192 (26 UNITS) – PHASE 7
To Supply, Construct And Complete
COMPLETED
2. CADANGAN PEMBANGUNAN SEMULA SEKOLAH DAIF DI NEGERI SARAWAK DI BAWAH PERUNTUKAN RM 1 BILLION (FASA 2) PAKEJ 3: SK BELIONG, SAMARAHAN; SK TANJUNG PISANG SELANGKING, SIMUNJAN; SK JAIE, ASAJAYA; SK TERASI, SAMARAHAN
Client : Jabatan Kerja Raya Sarawak, Bahagian Samarahan
COMPLETED
Mechanical Engineering, Electrical & Water Works
1. PROJECT REFURBISHMENT OF CHILLER AND ASSOCIATED WORKS STADIUM PERPADUAN SARAWAK
COMPLETED
2. CADANGAN MENAIKTARAF SISTEM PENGHAWA DINGIN DI MECHANICAL ELECTRICAL PLANT (MEP), UNIVERSITI MALAYSIA SARAWAK (UNIMAS), KOTA SAMARAHAN, SARAWAK.
Client : Universiti Malaysia Sarawak (UNIMAS)
COMPLETED
3. PACKAGE 3D – CONSTRUCTION AND COMPLETION OF TRANSMISSION MAIN CROSS BATANG SADONG BRIDGE TO SIMUNJAN, PIPELINE REPLACEMENT, RELOCATION AND EXTENSION AT SEBANGAN AND SEBUYAU ASSOCIATED WORKS, SAMARAHAN DIVISION.
Client: Jabatan Bekalan Air Luar Bandar
COMPLETED
Oil & Gas
1. Provission of Manpower for Project Management Team to LCOT Maintenance Contract
Client: Welfield Services Sdn Bhd
a. Upgrading and Construction of Tank Concrete Base Shoulder
b. Construction of Plant Pathway
c. Repair and Maintenance of Existing Electrical Building
COMPLETED
2. Fabricate Well Conductor Cover and Associated Structural Support for NC3 Plat
Client: Ropetech Sdn Bhd
a. Fabricate well conductor cover
COMPLETED
3. To Install Fireproofing coating for Piping Support at Petronas Intergrated Faculity
Client: Petra Resources Sdn Bhd
a. Supply TEC and Manpower to Install Fireproofing
COMPLETED
4. Repair HVAC Motor mounting
Client: Ropetech Sdn Bhd
a. Repair motor mounting
COMPLETED
5. NC3 Platform Emerging Construction Works related to Fabricate, Welding and Installation
Client: Ropetech Sdn Bhd
COMPLETED
6. Provision of Personnel, Equipment and Material Living Quarters Maintenance and Repair Services at EMEPMI PLATFORMS for “PM-MCM” Project – AFS 992A (EOG/LOA/PM-MCM(LQ)/2020/04(002)
Client: EPIC OG Sdn Bhd