GTJ Logo Trace

PROJECTS

ON GOING PROJECTS
SUBCONTRACT FOR BRIDGE WORKS, PROPOSED CONSTRUCTION AND COMPELTION OF MUARA LASSA BRIDGE, MUKAH DIVISION (JKR/576/19-01/GF/LA-01)  
Client: Pekerjaan Piasau Konkerit Sdn Bhd
    IN PROGRESS
PACKAGE 3D – CONSTRUCTION AND COMPLETION OF TRANSMISSION MAIN CROSS BATANG SADONG BRIDGE TO SIMUNJAN, PIPELINE REPLACEMENT, RELOCATION AND EXTENSION AT SEBANGAN AND SEBUYAU ASSOCIATED WORKS, SAMARAHAN DIVISION.    
Client: Jabatan Bekalan Air Luar Bandar    
     IN PROGRESS
COMPLETED PROJECTS
1. DEVELOPMENT AND UPGRADING OF THE PAN BORNEO HIGHWAY IN THE STATE OF SARAWAK (LBU/559/16-11/LA-24)    
Nominated Sub Contract For Supply, Delivery and Installation of Traffic Barriers (Guadrails)-Mile 5 –     Nyabau Flyover+ Jalan Bakun -Sg. Tangap)     Client: Lebuhraya Borneo Utara Sdn Bhd  
COMPLETED
2. DESIGN AND BUILD AND NEGOTIATED CONTRACT PROPOSED UPGRADING OF JALAN TUDAN, MIRI DIVISION
Road Pavement Work    
COMPLETED
3. PROPOSED DEVELOPMENT AND UPGRADING OF THE PAN BORNEO HIGHWAY IN THE STATE OF SARAWAK    
Jalan Nyabau to Jalan Bakun KM719 – KM763    
COMPLETED
4. PROPOSED DEVELOPMENT AND UPGRADING OF THE PAN BORNEO HIGHWAY IN THE STATE OF SARAWAK    
(Jalan Nyabau to Jalan Bakun KM719 – KM763)     Project Management Service – Drainage Works of Work Package 10    
COMPLETED
5. PROPOSED COASTAL BUND AND DRAINAGE SYSTEM AT SEBANGAN BAJONG DRAINAGE SCHEME, BLOCK E, SAMARAHAN DIVISION
Client : Jabatan Pengairan dan Saliran Sarawak    
COMPLETED
6. PROPOSED JALAN KAMPUNG PENASU KE NANGA SEMAH, DARO, MUKAH, SARAWAK     
Client : Jabatan Pengairan dan Saliran Sarawak    
COMPLETED
7. DEVELOPMENT AND UPGRADING OF THE PAN BORNEO HIGHWAY IN THE STATE OF SARAWAK – MILE 5 – NYABAU FLYOVER + JLN BAKUN – SG. TANGAP     
Bridges work over Sg. Suai, Sg. Sebubok, Sg. Sekaloh & Sg. Tangap of Work Package 10     
Client : Pekerjaan Piasau Konkerit    
COMPLETED
8. DEVELOPMENT AND UPGRADING OF THE PAN BORNEO HIGHWAY IN THE STATE OF SARAWAK – MILE 5 – NYABAU FLYOVER + JLN BAKUN – SG. TANGAP     
Drainage Works (Bakun Section : Km 0+000 – Km 41+700)     
Client : Pekerjaan Piasau Konkerit    
COMPLETED
9. PROJEK JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK PAKEJ A (FASA 3) – PEMBINAAN JALAN DARI KM 9.80 – KM 15.70, PEMBINAAN JAMBATAN SG. SELUAT DAN KERJA-KERJA BERKAITAN     
Client : Pekerjaan Piasau Konkerit    
COMPLETED
1. THE PROPOSED 91 UNITS DOUBLE STOREY TERRANCE HOUSE ON LOTS 8529-8552 & 10167-10233 [P/L 7530 (ORIGINAL LOT 876)], BLOCK 5, OFF JALAN PROMIN JAYA1, K.B.L.D., MIRI. (PHASE 6&7) PARTICULAR FOR SUBLOT 10167-10192 (26 UNITS) – PHASE 7     
To Supply, Construct And Complete
    COMPLETED
2. CADANGAN PEMBANGUNAN SEMULA SEKOLAH DAIF DI NEGERI SARAWAK DI BAWAH PERUNTUKAN RM 1 BILLION (FASA 2) PAKEJ 3: SK BELIONG, SAMARAHAN; SK TANJUNG PISANG SELANGKING, SIMUNJAN; SK JAIE, ASAJAYA; SK TERASI, SAMARAHAN     
Client : Jabatan Kerja Raya Sarawak, Bahagian Samarahan
    COMPLETED
1. PROJECT REFURBISHMENT OF CHILLER AND ASSOCIATED WORKS STADIUM PERPADUAN SARAWAK
    COMPLETED
2. CADANGAN MENAIKTARAF SISTEM PENGHAWA DINGIN DI MECHANICAL ELECTRICAL PLANT (MEP), UNIVERSITI MALAYSIA SARAWAK (UNIMAS), KOTA SAMARAHAN, SARAWAK.
Client : Universiti Malaysia Sarawak (UNIMAS)    
COMPLETED
1. Provission of Manpower for Project Management Team to LCOT Maintenance Contract    
Client: Welfield Services Sdn Bhd         
a. Upgrading and Construction of Tank Concrete Base Shoulder     
b. Construction of Plant Pathway     
c. Repair and Maintenance of Existing Electrical Building
COMPLETED
2. Fabricate Well Conductor Cover and Associated Structural Support for NC3 Plat     Ropetech Sdn Bhd      
a. Fabricate well conductor cover
COMPLETED
3. To Install Fireproofing coating for Piping Support at Petronas Intergrated Faculity     Petra Resources Sdn Bhd    
a. Supply TEC and Manpower to Install Fireproofing
COMPLETED
4. Repair HVAC Motor mounting     Ropetech Sdn Bhd     
a. Repair motor mounting
COMPLETED
5. NC3 Platform Emerging Construction Works related to Fabricate, Welding and Installation     Ropetech Sdn Bhd    
COMPLETED
6. Provision of Personnel, Equipment and Material Living Quarters Maintenance and Repair Services at     EMEPMI PLATFORMS for “PM-MCM” Project – AFS 992A (EOG/LOA/PM-MCM(LQ)/2020/04(002)    
COMPLETED